A home with rooftop solar panels in soft morning light
The same solar home at night with warm amber windows

The sun is free.We help you claim it.

Agra's trusted on-grid solar EPC. Unlock up to ₹1,08,000 in PM Surya Ghar + UP NEDA subsidies
and cut your electricity bill by up to 90% for the next 25 years.

★★★★★4.7 · 22 Google reviews · PM Surya Ghar & UP NEDA empanelled

Tata Power SolarWaareeAdani SolarVikram SolarPolycabHavellsLuminousSungrowGrowattMicrotek
Logos provided by Logo.dev

By the numbers

Three years. One mission. Sunlight, converted.

From a single 3 kW rooftop in 2022 to 500 kW industrial installations, every Ray Infratech project is engineered, commissioned and maintained in-house.

011,500+kW installedOn-grid · rooftop · ground
02220+Projects commissionedAcross UP & Delhi NCR
031,840 TCO₂ offsetLifetime, and counting
044.7★Google rating22 verified reviews

What we do

End-to-end solar EPC, from sun survey to grid sync.

Talk to an engineer
Residential

On-grid rooftop

Net-metering-ready 1–10 kW home rooftops, with your PM Surya Ghar subsidy filed for you.

Premium

Hybrid + storage

Solar, battery and grid together. Run essentials through power cuts and export when the sun shines.

Commercial

Commercial / MSME

50 kW–1 MW factory and shop installs, with accelerated depreciation benefits.

Off-grid

Off-grid power

Diesel-free farm pumps, telecom towers and remote sites on lithium battery banks.

Service

O&M + AMC

Annual maintenance, panel cleaning, inverter health checks and performance reports.

Paperwork

Subsidy + financing

Door-to-door PM Surya Ghar paperwork, UP NEDA filing and EMI partner options.

The Ray calculator

Tell us your bill. We'll tell you how much sun to buy.

An instant estimate of system size, cost, subsidy, payback and 25-year savings, calibrated for Agra irradiance.

₹3,500
400 sq ft
Connection type

Recommended system

3.5kW

System cost
₹2,10,000
PM Surya Ghar
− ₹78,000
UP NEDA
− ₹30,000
You pay
₹1,02,000
₹3,465saved / month
2.5 yrspayback
₹9.3 L25-year savings

Subsidies apply to residential on-grid systems. Estimate only; final quote after a free site survey.

Government schemes

Up to ₹1,08,000 back. Central plus state.

We file every form for you: the DISCOM application, vendor onboarding, net-meter installation and subsidy disbursement to your bank.

Central scheme

PM Surya Ghar Yojana

  • 1 kW₹30,000
  • 2 kW₹60,000
  • 3 kW and above₹78,000

Plus up to 300 free units a month for eligible homes.

State scheme

UP NEDA subsidy

  • Per kW₹15,000
  • Maximum₹30,000
  • Stacks with centralYes

Only empanelled vendors can install subsidised systems. Ray Infratech is empanelled for Agra and western UP.

₹78,000 PM Surya Ghar+₹30,000 UP NEDA=₹1,08,000 on a 3 kW+ home system
  1. 01

    Free site survey

    We measure your roof and check shading.

  2. 02

    Design & quote

    System design and a fixed quote within 48 hours.

  3. 03

    We file everything

    Portal application and DISCOM net-meter approval in 5–10 days.

  4. 04

    Install in 5–7 days

    Commissioned jointly with UP NEDA and DISCOM.

  5. 05

    Subsidy in your bank

    Paid to your Aadhaar-linked account within 30 days of switch-on.

Word on the street

4.7★ on Google from 22 reviews.

★★★★★
“I have installed 10kW of solar System. Quality of Product and Services very Good.”
Sachin Mangal10 kW rooftop · Agra
★★★★★
“Best company to install ongrid solar power plant. Smooth process and on-time delivery.”
शरणदीप ठाकुरOn-grid · 5 kW
4.7★★★★★Read all 22 reviews on Google

Questions

Before you go solar.

Still unsure? Ask us on WhatsApp.

Can I claim PM Surya Ghar and UP NEDA subsidies together?

Yes. The UP NEDA state subsidy (₹15,000 per kW, up to ₹30,000) is in addition to the central PM Surya Ghar subsidy (₹30,000–₹78,000). Both can be claimed for one rooftop, up to ₹1,08,000 in total.

Why does the installer have to be empanelled?

Only empanelled vendors can install subsidised rooftop plants. A non-empanelled installer voids your subsidy claim, even if you pay them privately. Ray Infratech is officially empanelled.

How long does the whole process take?

DISCOM net-metering approval usually takes 5–10 days and installation 5–7 days. Most homes are switched on within 30 days of the site survey.

Who handles the paperwork?

We do. From the portal application and DISCOM approval to net-meter installation and subsidy disbursement, our team files it all on your behalf.

What powers my home at night?

With net-metering, extra power your panels make during the day is exported to the grid as credits. At night you draw from the grid against those credits, so your bill stays close to zero.

Ready when you are

The next 25 years of your electricity bill, in your hands.

Book a free site survey. We'll measure your rooftop, work out the exact yield for Agra's sunlight, file your subsidy and switch you on within 30 days.